Anonymised Client Case

BESS Cluster for Distributed Industrial and Multi-Site Operations

How a mid-size company with distributed sites reached the 1 MW FCR minimum bid size by clustering smaller storage units, while reducing peak loads at each plant connection.

Client and Situation

Private mid-size company with 8 distributed sites in Germany (industry / retail network / logistics – anonymised). Per site: 250-630 kW grid connections, 80-300 kWp PV. Problem: individual sites are too small for stand-alone balancing reserve marketing (FCR minimum lot 1 MW). Peak loads vary per site, grid charges between EUR 8-25k/year per site. Previously self-consumption only, no market access.

BESS Cluster Sizing

Storage per site

from 100 kW

Capacity per site

300-600 kWh

Cluster total

≥ 1.2 MW / 2.4 MWh

Technology

LFP, IP55

Per site storage from 100 kW upwards, sized for local peak-load needs. Aggregation via central EMS and pool aggregator into a virtual 1.2+ MW cluster. Advantage over single large storage: lower CAPEX per unit, § 7g EStG eligible sizes per entity, decentralised resilience, no single grid bottleneck.

Multi-Use Marketing within the Cluster

FCR pool marketing

~EUR 50/MWh

Aggregation of all sites to 1 MW minimum lot. Pool aggregator handles bid strategy.

Per-site peak shaving

EUR 8-25k/year/site

Local peak reduction at the plant connection (StromNEV § 19).

Self-consumption optimisation

~EUR 30/MWh

Buffering PV surplus per site.

Selective intraday arbitrage

seasonal

EPEX SPOT at high spreads, orchestrated by central EMS.

Tax Optimisation – Cluster Advantage

  • § 7g EStG IAB usable per site/entity (profit cap EUR 200,000 each) – clustering maximises IAB volume vs. a single large unit.
  • Special depreciation 40 % per site in year of acquisition + 4 following.
  • Electricity tax exemption per site via Hauptzollamt registration.
  • Across 8 sites at EUR 80-150k investment each: total tax shield in the EUR 250-400k range over 5 years.

Outcome

  • Cluster of 8 storage units with virtual 1.2 MW capacity successfully placed in the FCR market.
  • Peak shaving per site EUR 8-25k/year, cluster sum ~EUR 120k/year.
  • Blended yield FCR + peak shaving + self-consumption consolidated ~EUR 80/MWh.
  • Payback projected ≤ 7 years through aggregated tax benefits.
  • Scaling potential: further sites can join the existing pool seamlessly.

Risks and Sensitivities

  • Pool aggregator dependency: contract terms on yield distribution, exit options.
  • Communications infrastructure: stable connection of all sites to central EMS (4G/fibre redundancy recommended).
  • Market design risk: TSO adjustments to the FCR market possible.
  • Site disparity: load profiles, PV ratios and grid charge structures vary per site – individual sizing rather than uniform hardware recommended.