Battery storage is technology.The German market is regulation.

I bring international storage manufacturers into the German market. And I help operators bundle single units into a cluster that can reach more than one market.

Geöffneter Batteriespeicher-Schrank mit Modulracks und Steuerpanel

6

Utilities founded

100MW

Pipeline: 1,000 × 100 kW

2.000+

PV projects

15+

Years experience

Storage cluster

Ten units are one threshold.

FCR, aFRR and mFRR each require a 1 MW minimum bid. A 100 kW unit reaches one tenth of that. In a cluster, the threshold falls.

Minimum bid per market – bar length shows the threshold
  • EPEX Spotfrom 1 unit
  • FCR – primary control reservemin. bid 1 MW
  • aFRR – secondary reservemin. bid 1 MW
  • mFRR – minute reservemin. bid 1 MW
  • § 118 (6) EnWGno minimum size

1 MW minimum bid since BNetzA ruling BK6-21-042 of 28 April 2022.

Understand the cluster

AgNeS

  • As of 7 October 2026: a draft, not a ruling.
  • Consultation closed on 18 September 2026.
  • Decision still planned for 2026. Capacity charge from 2029.
AgNeS in detail
“
Founding an energy utility in Germany is not a secret – it is a clearly defined regulatory process. You just have to have gone through it completely once. I have done it six times.

Bernhard Mike Petrovic

Founder, EXAA Exchange Trader & Project Manager RE

Certifications

EXAA Exchange Trader (Spot + Environmental)Project Manager RE (BAFA/KfW)Solar Energy Expert15+ years of industry experience

One conversation before you plan.

Whether you bring storage technology to Germany, form a cluster or build a virtual power plant: the first call clarifies whether and how it works.