Pooling storage: clusters and a virtual power plant for FCR, aFRR and arbitrage
Problem
A single battery serves one market per time window. A cluster can serve several, because different units take different windows. Prequalification and the minimum size remain the hurdle.
What I do
- I set out the structure: which units should join, which markets are realistic at the minimum size, which points the marketer’s contract must settle.
- I accompany the choice of marketer.
How it runs
- 1FCR, aFRR and mFRR each require a 1 MW minimum bid under Bundesnetzagentur decision BK6-21-042 of 28 April 2022.
- 2Prequalification with the transmission operator, proof of controllability and a marketing contract are what turn a pool into a bid.