Three things I help with.

Market entry, storage clusters and virtual power plants. From 15 years of doing the work.

01B2B

Market entry Germany

In Germany, international storage technology meets certification, grid connection and regulation. I guide manufacturers through the procedures: BNetzA notification, balancing group contract, GPKE/MaBiS certification, up to productive operation.

BNetzAGrid connectionBalancing groupGPKE/MaBiS
02Large-Scale Projects

Storage clusters and BESS

From a single unit up to 100 MW and 200 MWh. I look at the site, the grid connection, and the numbers. And I check whether an investor's figures hold.

Up to 100 MW / 200 MWhSite AnalysisDue DiligenceGrid Connection
03Operations

Virtual power plants

Prequalification, minimum bid sizes per balancing product, choice of marketer and contract design. I support the build-up and operation of virtual power plants without marketing energy myself.

PrequalificationFCR / aFRR / mFRRPool sizesMarketer selection